STATION 01 — INPUT
Cleaner Lines.
Steadier Output.
Maruwa works alongside plant leaders and floor teams to map where work slows, tighten standard routines, and build a production environment that moves at a comfortable, consistent pace.
STATION 02 — MAKE
Our Three Service Stations
Each engagement is sized for where you are right now. Start with a walkthrough or step into a longer working relationship — the approach is yours to choose.
STATION A
Production Walkthrough Review
A practical walkthrough of one production line to observe flow, handoffs and where time is lost, with gentle notes. Suited to small manufacturers. Includes a line map and a short observations list.
- Line map of current flow
- Handoff & timing observations
- Written observations list
฿4,400
Request a Quote
STATION B
Efficiency Improvement Project
A hands-on engagement to refine layout, sequencing and standard routines with your floor team, tested in small steps. We document the agreed way of working. Includes process documentation and a rollout outline.
- Layout & sequencing review
- Standard routine documentation
- Rollout outline for your team
฿22,000
Request a Quote
STATION C
Manufacturing Advisory Engagement
An ongoing advisory relationship supporting plant leaders on planning, maintenance routines and continuous improvement. We provide a steady outside view. Includes regular sessions and a quarterly review.
- Regular advisory sessions
- Maintenance routine guidance
- Quarterly progress review
฿35,000
Request a QuoteWHY MARUWA
What You Can Expect
We keep our work close to the floor. No large decks, no off-site thinking. We come to where the work happens.
Floor-Level Work
We spend time on the production floor — not in the boardroom. Observations are direct and the notes we write reflect what we actually see.
Staged Approach
Changes are tested in small steps before becoming standard practice. This protects your output while the improvement is being shaped.
Clear Documentation
Every engagement ends with written materials your team can keep and use. Standard routines, line maps, and agreed working methods are all recorded.
Team Involvement
We work alongside your operators and supervisors, not around them. Their knowledge of the line shapes the improvements we suggest.
Outside Perspective
A fresh pair of eyes on a familiar process often surfaces things that experienced teams have long stopped noticing. We bring that view without disrupting daily operations.
Priced for SMEs
Our services are sized and priced for small and growing manufacturers, not large corporate programmes. The scope matches what your operation can absorb.
STATION 03 — FINISH
Is Your Line Running the Way It Should?
A short conversation about your current situation is often enough to clarify where to start. There is no obligation and no pressure — just a practical discussion about your production environment.
FAQ
Common Questions
What does a Production Walkthrough Review involve?
How long does an Efficiency Improvement Project typically run?
Does my team need to prepare anything before you arrive?
Are the prices fixed or subject to change after the engagement starts?
Can we start with a walkthrough and move into an ongoing advisory later?
How do you handle confidential production information?
LOCATION
Find Us at Bang Phli Industrial Estate
199 Bang Phli Industrial Estate, Bang Sao Thong, Samut Prakan 10570
CONTACT
Let's Talk About Your Operation
Contact Details
PHONE
+66 2 705 3862ADDRESS
199 Bang Phli Industrial Estate,
Bang Sao Thong, Samut Prakan 10570
WORKING HOURS
Mon – Fri: 08:00 – 17:30
Sat: 09:00 – 13:00
Sun: Closed